Between St Neots and Stevenage? For past few weeks it seems to me that trains are slowing, often to a crawl, between St Neots and Stevenage and it doesn't matter what time of day you travel either. I've travelled at all times of day in the past 3 weeks and we always seems to slow right down in sort of the Biggleswade area. Even the 23.30 last last night slowed right down. I haven;t seen any signs of engineering work but that doesn;t mean there isn't any. But if this is, surely 3 weeks is enought to complete most things.